Subgrade Preparation & Base Layers
Proper asphalt performance depends on what's underneath. A well-compacted subgrade and stable base layer prevent cracking, rutting, and premature failure.
Key Construction Layers
- Subgrade: Native soil compacted to 95% Proctor density. Test for moisture content and bearing capacity.
- Base Course: Crushed stone (4-6 inches) provides drainage and load distribution. Essential for heavy traffic areas.
- Binder Course: Intermediate asphalt layer (2-3 inches) for structural strength on roads.
- Surface Course: Final wearing course (1.5-2 inches) with fine aggregate for smooth ride and skid resistance.